Firstly the windows have been put in….
The front of the annexe as you walk up the drive |
The back of the annexe looking towards the back of the house |
Meanwhile
all the drive has been dug up ready for the installation of the new
block paving which is going from the front of the house, up the drive
and then half way down the back garden to the patio.
Of course Hugh had to mess around on the pile of rubble....
Standing in the bedroom looking towards the bathroom/hall |
Standing in the living area looking back to the bathroom |
Electrical
cables and pipework for the central heating has all been installed too
but there isn’t much I can show you for that! And then last week the
door was installed and now it really looks like a little house!
We
have had the plasterers in this week and so now we have to wait for the
plaster to dry and then the bathroom can be installed and we can start
decorating.
Penny
and I had the kitchen designer in from Wickes last week and this
morning we are back at Wickes to see her design and to (hopefully) order
the kitchen. We will be coming back via the flooring/tiling showroom to
order the flooring for
the living area/hall/bathroom and the tiles for the bathroom. I am
slowly beginning to see the light at the end of the tunnel! Penny is
getting more and more excited and cannot wait to move in!
Oh yes - one more thing ... Penny passed her driving test this week!
3 comments:
Yeah, well done Penny. Driving is such a wonderful sense of freedom & independence. The little house is moving along quickly, soon a home!
It is so nice, can't wait to see it finished!
Lots of fab things happening in and around your home right now!
Post a Comment